MANILA, Philippines — The Energy Regulatory Commission (ERC) announced that it has issued the 2025 Amended Rules Enabling the Net-Metering Program for Renewable Energy.
The regulator said this development aimed to streamline the implementation of the net-metering program and make renewable energy (RE) adoption more accessible to qualified end-users.
Following a series of public consultations and careful review of stakeholders’ inputs, the ERC issued Resolution 15, Series of 2025, introducing key amendments aimed at strengthening consumer protection and simplifying processes for availing of the program.
As per the ERC, one of the key amendments permits the banking and rollover of net-metering credits toward a qualified end-user's electricity usage across current and future billing periods.
It added that in the event of a property ownership change, the credits may be transferred to the new owner, subject to conditions such as a conforme letter from the original owner.

ERC amends net-metering rules to expand renewable energy options
Net-metering allows customers of distribution utilities to install an on-site Renewable Energy (RE) facility not exceeding 100 kilowatts (kW) in capacity so they can generate electricity for their own use.
In turn, any electricity generated that is not consumed by the customer is automatically exported to the distribution utility's’s distribution system., This news data comes from:http://btp-pnh-ytrc-hc.ycyzqzxyh.com
- Mexican drug lord faces life in prison after pleading guilty in US court
- Marcos lauds Alex Eala’s win in Guadalajara
- Customs finds only 2 luxury cars at contractor's compound in Pasig
- HEADLINES: 15 drug war victims cleared to join Duterte's ICC case | Sept. 7, 2025
- Private groups back DHSUD chief's anti-corruption policy
- Senators Estrada and Villanueva deny getting kickbacks after former engineer tags them in House hearing
- GoTyme gives customers 20 free InstaPay transfers per month
- Immigration: 1st lookout bulletin in effect on 35 individuals, including Discayas, linked to anomalous flood control projects
- Aftershocks rumble quake-hit Afghanistan as death toll tops 1,400
- Japan accelerates missile deployment amid rising regional tensions